Skip to Content
Glossary

Glossary

TermMeaning
Basis / price gapThe difference between the same coin’s price on two venues.
Basis point (bp)0.01 %. A 4 bp fee is 0.04 %.
Break-evenHours of funding a trade needs to pay back its round-trip cost.
Delta-neutralA long and a short of the same size: price moves cancel, funding remains.
Funding rateThe periodic payment between longs and shorts that keeps a perpetual near spot.
Funding intervalHow often a venue pays funding: 1, 4 or 8 hours.
HedgeThe second leg, placed to cancel the first leg’s price exposure.
LegOne side of a trade: the long on one venue, or the short on the other.
Mark priceThe venue’s reference price for P&L and liquidation.
Marketable limitA limit order priced to fill at once, with a cap on the worst price.
Net APRAPR after fees, slippage and the price-gap edge, spread over the hold. See Net APR.
Net resultFunding received − fees paid − estimated cost to close now.
Perpetual (perp)A futures contract with no expiry.
Round tripOpening and closing a trade: fees and slippage both ways.
SlippageThe difference between the mid price and the average price you are filled at.
SpreadShort-leg funding minus long-leg funding, per 8 hours.
Taker feeThe fee for an order that fills immediately against the book.
UnwindClosing the first leg again because the second could not be opened.